Electrical & Instrumentation Specialist

Powering and controlling Vietnam's industrial plants

Dong Yang Vina E&C is a specialist E&I contractor that combines Korean engineering standards with a skilled local workforce. Since 2007 we have built and maintained electrical and instrumentation systems for leading plants across Vietnam.

30 yearsIn electrical construction (since 1996)
2007Established in Vietnam
USD 17MLargest single contract
1,317Peak workforce on a single site

About us

Korean engineering, local execution

Dong Yang Vina E&C is the Vietnamese subsidiary of Dong Yang Electrical, founded in Pohang, Korea in 1996, and opened in Vung Tau in 2007. We entered Vietnam with steel plant experience gained as an electrical partner of POSCO E&C, and have since expanded into refining, petrochemicals, power generation, ports and semiconductor facilities.

By pairing Korean schedule and quality management with an experienced Vietnamese workforce, we deliver on time and safely, even in demanding conditions such as live, operating plants. Our commitment does not end at handover: we stay on to maintain the systems we build, so our clients' facilities keep running reliably.

Vietnam Head Office

Dong Yang Vina Engineering & Construction Co., Ltd.

Address
Room 104, Sea View 4 Apartment, Chi Linh Central Zone, Ward 10, Vung Tau, Vietnam
Fax
+84 254 3615 489
Established
September 17, 2007
CEO
Kim Seong Jun
Capital
USD 600,000

Korea Head Office

Dong Yang Electrical Co., Ltd.

Address
249-1 Ochenli, Younilup, Namgu, Pohang city, Gyungbuk, Korea
Fax
+82 54 285 1918
Established
February 24, 1996
CEO
Kim Jang Woong
Capital
USD 300,000

Milestones

  1. Dong Yang Electrical founded in Pohang, Korea

  2. Registered as an electrical contractor (Gyeongbuk-00293)

  3. Power operation division launched

  4. ISO 9001 certified (Korean Standards Association)

  5. Registered as an electrical partner of POSCO E&C

  6. Switchgear and control panel factory registered

  7. Licensed for overseas construction

  8. Dong Yang Vina E&C established in Vietnam

  9. Appointed key subcontractor to POSCO E&C Vietnam

  10. Appointed key subcontractor to Seohee Construction

  11. Capital increased to USD 600,000

  12. ISO 9001, 14001 and 45001 certified (VFA)

Services

End-to-end E&I delivery

From engineering and construction to commissioning and long-term maintenance, one team takes responsibility for every stage of a plant's electrical and instrumentation scope.

Electrical Construction

Switchgear and power and control panels, main feeders and cabling, energizing, lighting, lightning protection and grounding: the complete power system of an industrial plant.

Refining & petrochemicals · Steel · Power · Semiconductors & manufacturing · Ports

Instrumentation

Field instrument installation, instrumentation wiring and calibration, with in-house capability for the design and installation of special fire-fighting systems.

Refining & petrochemicals · Steel · Power · Manufacturing

E&I Maintenance

Preventive and corrective maintenance for operating plants: inspection, troubleshooting and overhaul of motors, panels and field instruments to keep production running safely.

Long-term maintenance contracts with Hyosung Vina Chemicals, SK and others

Core values

Quality, safety and the environment come first

Thinks Environment First. Three principles we hold on every site.

Quality

An ISO 9001 quality management system verifies every stage of the work, so each installation meets the client's specification precisely.

Safety

We run an ISO 45001 management system and dedicated on-site HSSE teams. Hyosung Bio-BDO, the OCI modules and HSVC PP5 were all completed without a single lost-time incident.

Environment

Following ISO 14001, we apply environmentally responsible methods and keep the impact of construction on its surroundings to a minimum.

Projects

Proven on Vietnam's landmark plants

Selected electrical and instrumentation projects across refining, petrochemicals, steel, power and semiconductors. Select a project for details.

Clients & partners

Working alongside global industry leaders

  • Hyosung Vina Chemicals
  • Hyosung TNC
  • SK ecoengineering
  • SK Ecovance
  • Amkor Technology Vietnam
  • SGC eTEC
  • POSCO E&C
  • POSCO Vietnam
  • POSCO SS Vina
  • POSCO VST
  • POSCO Yamato Vina
  • Formosa Ha Tinh Steel
  • Nghi Son Refinery & Petrochemical
  • JGSC
  • Bumhan Vina
  • CMIT
  • CS Wind Vietnam
  • Hyundai Welding Vina
  • Hansol Vietnam
  • Seohee Construction

Organization

Organization

CEOKim Seong Jun
  • General Affairs
  • Project Control
  • Electrical Construction Division
    • Electrical Engineering
  • Instrumentation Division
    • Instrument Engineering
  • Maintenance Division
    • E&I Maintenance
    • Maintenance Consulting

HSSE and QA/QC are managed by dedicated teams at each site.

Certifications & licenses

Management systems built on international standards

ISO 9001Quality management
ISO 14001Environmental management
ISO 45001Occupational health and safety
Construction LicenseVietnamese construction license and capability certificate

Business registration, construction licenses, certificates and financial statements are available on request.

Contact

Discuss your project

For quotations, partnership proposals or company documents, contact us by email or phone.

Send an email
Illustrative image

2026

SK TERRA (Ecovance) Plant E&I Maintenance

Having worked on the SK TERRA plant in Hai Phong since construction, we now maintain its electrical and instrumentation systems plant-wide.

Period
2026.03 – 2026.12
Location
Hai Phong
Client
SK Ecovance
Contract value
USD 452,000

Scope of work

Electrical and instrumentation maintenance for the entire plant

Project overview

Illustrative image

2025 – 2026

Hyosung TNC Bio-BDO (VB1)

E&I works for a bio-BDO plant that produces sustainable chemicals from sugarcane instead of fossil fuels, completed on schedule with zero lost-time incidents.

Period
2025.06 – 2026.01
Location
Ba Ria – Vung Tau
Client
Hyosung TNC
Contract value
USD 385,125

Scope of work

Electrical and instrumentation works

Project overview

Illustrative image

2024 – 2025

OCI Modules E&I Works (Bumhan Vina)

E&I works on the ME1/MP7 modules for an epichlorohydrin (ECH) plant in Malaysia, carried out in Hai Phong and completed on schedule with zero lost-time incidents.

Period
2024.11 – 2025.06
Location
Hai Phong
Client
Bumhan Vina / OCI
Contract value
USD 1,158,441

Scope of work

Module electrical and instrumentation works

Project overview

Illustrative image

2024 – 2025

SK TERRA (Leaveo) Plant E&I Works

Full electrical and instrumentation scope, including utilities and main energizing, for the new SK TERRA plant in Hai Phong.

Period
2024.09 – 2025.07
Location
Hai Phong
Client
SK ecoengineering
Contract value
USD 3,640,712

Scope of work

Electrical and instrumentation works; utilities including main energizing and logistics

Project overview

Illustrative image

2022 – 2023

Amkor Technology Vietnam (ATV) New Plant Electrical Works

Electrical works and energizing for the outside-battery-limits (OSBL) area of Amkor's new semiconductor packaging and test plant in Vietnam.

Period
2022.10 – 2023.09
Location
Vietnam
Client
Amkor / SGC eTEC
Contract value
USD 3,220,770
Manpower
21,660 man-days (peak 102 workers)

Scope of work

OSBL electrical works; utilities including main energizing and logistics

Project overview

Illustrative image

2021 –

Hyosung Vina Chemicals (HSVC) Plant Maintenance

Involved in the Hyosung Vina Chemicals complex since construction, we have provided continuous E&I maintenance and turnaround support since 2021.

Period
2021 –
Location
Cai Mep, Ba Ria – Vung Tau
Client
Hyosung Vina Chemicals

Scope of work

Complete electrical and instrumentation maintenance

Project overview

Illustrative image

2020 – 2021

Hyosung Vina Chemicals PP5

Built inside an operating complex, the project faced hot-work restrictions, strict access control and tight environmental management. Our experience and disciplined site control delivered it on schedule with zero lost-time incidents.

Period
2020 – 2021
Location
Cai Mep, Ba Ria – Vung Tau
Client
Hyosung Vina Chemicals
Contract value
USD 4,120,390
Manpower
50,980 man-days (peak 512 workers)

Scope of work

Electrical and instrumentation works, temporary power

Project overview

Illustrative image

2020 – 2021

Hyosung Vina Chemicals OL1 (PDH)

Vietnam's first propane dehydrogenation (PDH) unit, a high-temperature, high-pressure process. Despite the monsoon season and COVID-19, the works were completed within the contract deadline.

Period
2020.08 – 2021.09
Location
Cai Mep, Ba Ria – Vung Tau
Client
Hyosung Vina Chemicals
Contract value
USD 4,162,217
Manpower
56,652 man-days (peak 588 workers)

Scope of work

Electrical and instrumentation works, temporary power

Project overview

Illustrative image

2019 – 2020

Hyosung Vina Chemicals PP4

A large petrochemical complex producing polypropylene, ethylene and propylene from liquefied gas, including 240,000-ton underground LPG storage. We completed the full E&I scope.

Period
2019.03 – 2020.04
Location
Cai Mep, Ba Ria – Vung Tau
Client
Hyosung Vina Chemicals
Contract value
USD 4,731,400
Manpower
56,012 man-days (peak 468 workers)

Scope of work

Electrical and instrumentation works, temporary power

Project overview

Illustrative image

2017 – 2018

NPK Fertilizer Plant

E&I works for a compound fertilizer plant in southern Vietnam that supplies around 9% of the country's fertilizer.

Period
2017.03 – 2018.03
Location
Southern Vietnam
Contract value
USD 2,636,000
Manpower
75,850 man-days (peak 158 workers)

Scope of work

Electrical and instrumentation works, temporary power

Project overview

Illustrative image

2014 – 2017

Nghi Son Refinery & Petrochemical (NSRP)

On Vietnam's largest refinery and petrochemical complex we delivered Zone 3 E&I and, as the only contractor performing electrical and instrumentation works together, supported the other zones as well.

Period
2014.12 – 2017.03
Location
Thanh Hoa
Client
NSRP / JGSC
Contract value
USD 17,000,000
Manpower
512,020 man-days (peak 1,317 workers)

Scope of work

Electrical and instrumentation works (Zone 3)

Project overview

Illustrative image

2014 – 2015

Formosa Nhon Trach Thermal Power Plant

The E&I package of a 450 MW thermal power plant, establishing our capability in power generation.

Period
2014.12 – 2015.12
Location
Dong Nai
Client
Formosa
Contract value
USD 1,953,000
Manpower
56,851 man-days (peak 123 workers)

Scope of work

Electrical and instrumentation works

Project overview

Illustrative image

2014 – 2015

Formosa Ha Tinh Steel Hot Rolling Mill

Drawing on hot-rolling projects we built and commissioned in Korea, we delivered the E&I works, temporary power and dormitory civil works for the Formosa Ha Tinh hot rolling mill.

Period
2014.01 – 2015.12
Location
Ha Tinh
Client
Formosa Ha Tinh Steel
Contract value
USD 11,316,000
Manpower
282,959 man-days (peak 250 workers)

Scope of work

Electrical and instrumentation works, temporary power, dormitory civil and building works

Project overview

Illustrative image

2012 – 2014

POSCO SS VINA Special Steel Plant

E&I and temporary power works for a one-million-ton special steel plant and its dedicated port.

Period
2012.05 – 2014.06
Location
Ba Ria – Vung Tau
Client
POSCO SS Vina
Contract value
USD 11,316,000
Manpower
194,408 man-days (peak 255 workers)

Scope of work

Electrical and instrumentation works, temporary power, dedicated port

Project overview

Illustrative image

2009 – 2012

Cai Mep International Terminal (CMIT)

Electrical, instrumentation and civil works for Cai Mep International Terminal, one of Vietnam's flagship deep-water container ports.

Period
2009.06 – 2012.06
Location
Cai Mep, Ba Ria – Vung Tau
Client
CMIT
Contract value
USD 10,093,114
Manpower
201,304 man-days (peak 195 workers)

Scope of work

Electrical and instrumentation works, temporary power, civil works

Project overview

Illustrative image

2008 – 2010

POSCO Vietnam Cold Rolling Mill (PL/TCM)

One of our first major projects in Vietnam: E&I and temporary power works for a 1.2-million-ton cold rolling mill.

Period
2008.05 – 2010.05
Location
Ba Ria – Vung Tau
Client
POSCO Vietnam
Contract value
USD 3,317,563
Manpower
96,624 man-days (peak 154 workers)

Scope of work

Electrical and instrumentation works, temporary power

Project overview